top of page
Untitled design (80).png

Paddington Crossrail Link Tunnel

This project included bomb blast compliant glazed wall cladding, bulkheads, and handrails. The design and engineering process focused on creating robust architectural features that met stringent safety standards while maintaining aesthetic appeal. High-quality materials were carefully selected and fabricated to ensure durability and functionality. Installation required precision to align with the client’s specifications and adapt to site conditions, resulting in a seamless and visually impactful outcome.

- Bomb blast compliant glazed wall cladding
- Bulkheads
- Handrails

bottom of page