top of page
Untitled design (80).png

Heathrow T3 CSA

This project delivered all new architectural metalwork and glazing within the new Central Search Area (CSA) at Heathrow Terminal 3, covering design, supply and installation. The package included ASIAD-compliant structural glazing to the new CSA walling, full-height glazed partitions and screens, glass doors and glazed exception desk gates, along with mild steel PPC and glazed wall linings, column casings and glazed balustrades. Supporting metalwork included pilasters and steelwork, trolley bump rails and corrals, handrails, floor-mounted protection bollards and removable tensator barriers with cast-in sockets.

All works were carried out in a live terminal environment, at night and within a reduced working window. Every shift had to be carefully planned around ongoing airport operations, with work areas set up, completed and made safe before the terminal reopened to passengers each morning.

- ASIAD-compliant structural glazing to CSA walling
- Glazed wall linings (structural and non-structural)
- ASIAD-compliant mild steel PPC wall linings
- ASIAD-compliant full-height glazed partitions
- ASIAD-compliant glass doors and supports
- Door thresholds and interface metal/glazed panels
- ASIAD-compliant column casings
- ASIAD-compliant glazed exception desk gates
- ASIAD-compliant glazed balustrades and full-height internal screens
- ASIAD-compliant glazed screens with frosted glass
- Pilasters and supporting steelwork
- Trolley bump rails and trolley corrals
- Handrails
- Removable tensator barriers and posts with cast-in sockets
- Aluminium chequerplate wall linings
- Floor-mounted protection bollards

bottom of page